S.no
|
Projects
|
Clients |
Years |
1 |
Complete soil exploration at bridges sites between JYG-DBG in connection with GC of JYG-DBG-NKE section.
|
EAST CENTRAL RAILWAY |
2005-2006 |
2 |
Soii Exploration for collecting ail required input data for design of major bridge I viaducts and ROBs in Barkakana – Ranchi Section in connection with construction of new B.G Rail from Koderma to Ranchi.
|
EAST CENTRAL RAILWAY |
2007-2008 |
3 |
Soil Exploration for collecting all required input data for design of major bridge / viaducts and ROBs in Barkakana-Ranchi Section in connection with construction of new B.G.Rail line from Koderma to Ranchi.
|
EAST CENTRAL RAILWAY |
2007-2008 |
4 |
Soil investigation and submission of report tor Major Bridges, Flyovers in connection with construction of 3rd line work, Flyover between Bakhtiyarpur and Punarakh station and rebuilding of Br. No. 136 (Kiul Bridge) in Patna Jhajha section.
|
EAST CENTRAL RAILWAY |
2008 |
5
|
Sub soil investigation and submission of report for Thanabihpur-Naugachhia section (New DN line) in connection with doubling of this section on barauni-katihar line of SEE Division of ECR.
|
EAST CENTRAL RAILWAY |
2009-2010 |
6
|
Soll Investigation of major bridges of Sitamarhi Motihan (78.925 Kms) new line.
|
EAST CENTRAL RAILWAY |
2009-2010 |
7
|
Sub soil investigation and submission of report for construction of minor bridges, ROB’ s, RUBs etc. between Islampur arid Natesar and Neora – Daniawan – Biharsharif – Barbigha in connection with construction of new B. G. line under Dy. CE/Con/RGD unit etc.
|
EAST CENTRAL RAILWAY |
2010-2011 |
8
|
Geotechnical Investigation in Construction of Sivok-Rangpo BG New Rail Line Project of N.F. Railway” situated between Sivak Railway Staton, West Bengal and Rangpo Town of Sikkim. The fesent work is to be executed between Ch.0/500 to Ch.4/420 i.e. between Sivak and Andhert Jhora.
|
IRCON |
2010-2010 |
9
|
Geolechnicial lnvestigation work in connection vMh HEP en river Balason.
|
Abhijeet Bengal Hydel Energy Limited |
|
S.no
|
Projects
|
Clients
|
Years |
1
|
Sub-Soil Exploration & Rock Drilling work in connection with minor/major bridges under P. M. G. S. Y. Road in Giridih dist. in the state of Jharkhand.
|
HICON |
2011-12 |
2
|
Sub-Soil Exploration work in the state of Bihar.
|
Gilcon Project Services Ltd. |
2011-2012 |
3
|
Sub-Soil Investigation as per scope of work listed below for the work of “Earth work from Chainage 14/700 KM to 19/100 KM in connection with construction of North Rail approach of Rail Cum Road Bridge at Munger.”
|
M/s Arvind Techno Engineers Pvt. Ltd |
2011-2012 |
4
|
Soil exploration for collecting all required input data for designing of wells in Major Br. No.-26 at Km. 16.872 in Koderma-Hazaribagh Section and at all other locations in Koderma-Hazaribagh-Barkakana (Upto Km. 110.500) Section where ever required in connection with Koderma- Ranchi New Rail Line projects.
|
EAST CENTRAL RAILWAY |
2011-2012 |
5
|
Complete soil exploration at bridge sites of Major Bridge No. 65, 71, 75A, 77, 80, 81,97A, 111, 112, 1 14, 118, 124, 126 & 129 in Sakri- Ninnali section and Major Bridge No. 7A, 21A, 21B, 21C & 36A in JhanjharpurLaukaha Bazar section in connection with gauge conversion of Sakari Nirmali & Jhanjharpur- Laukaha Bazar section.
|
EAST CENTRAL RAILWAY |
2011-2012 |
6
|
Drilling work in various strata & field tests at Patna site.
|
AAKAR ABHINAV Consultants Pvt. Ltd. |
2011-2012 |
7
|
Geotechnical investigation in H.L. R.C.C. Bridge over river Merhar at BaijudhamCherki-Dariyapur-Gurua road in Gaya District Under NABARD scheme.
|
Bihar Rajya Pul Nirman Nigam Limited
|
2012-2012 |
8
|
Geo-technical Investigation Report, proposed Construction of H.L. R.C.C. Bridge over River Daha Between Siwan-Aandar Road On 16th KM, in the District of Siwan (Bihar).
|
Bihar Rajya Pul Nirman Nigam Limited
|
2012-13 |
9
|
Consultancy Services for Detailed Engineering for Four Lanning of Patna – Bakhtiyarpur section of NH-30 from Km 181.300 to Km 231.950 in the state of Bihar under NHDP Ill on DBFOT Toll basis. (Four Lanning of Patna -Bakhtiyarpur Section of NH-30 )
|
Gifford |
2012-2012 |
10
|
Soil exploration for collecting all required input data for design and construction of H.L. R.C.C. Bridge in Cherki Dariyapur-Baijudham-Gurua Road near Baijudham over river MORHAR in the District of Gaya.
|
Bihar Rajya Pul Nirman Nigam Limited |
2012-13 |
11
|
Sub-Soil Exploration Work & Topographical Survey within 50KM from Patna.
|
Carlsberg India Pvt. Ltd. |
2012-13 |
12
|
Sub soil investigation and submission of report for construction of minor bridges, ROB’ s, RUBs etc. between Islampur arid Natesar and Neora – Daniawan – Biharsharif – Barbigha in connection with construction of new B. G. line under Dy. CE/Con/RGD unit etc.
|
EAST CENTRAL RAILWAY |
2013-2014 |
13
|
Soil exploration for collection all required input data for design of balance Major bridges, ROB, RUB, Minor bridges and cutting in the diverted alignment from Km. 94.00 to Giridih in connection with Koderma-Giridih New BG line and any where under the jurisdiction of Dy. CE/Con/Dhanbad
|
EAST CENTRAL RAILWAY |
2013-2014 |
14
|
Geotechnical Investigation for the Construction of Green Field Six Lane Extra dosed Cable Bridge over river Ganga near Kacchi Dargha on NH-30 to near Bidupur in Dist Vaishali on NH-103 at Patna in the State of Bihar.
|
Larsen & Toubro Limited |
2013-14 |
15
|
Geo-technical Investigation for the construction of major and minor bridge for “Two laning of saraiya-Motipur Road (SH-86) length of 28.181 km, Runisaidpur-Bhishwa Road (SH-87) from km 0.000 to 67.486 & R.O.B. at Ch. 12.076 km of (SH-83) in the state of Bihar.
|
Nagesh Consultants
|
2013 |
16
|
Carrying out Geotechnical Investigation for bridges to be constructed under PMGSY scheme in Banka, Purnea, Katihar, Bhagalpur, Lakhisarai and Begusarai district in Bihar.
|
Chaitanya Project Consultancy Pvt. Ltd.
|
2013 |
17
|
Geotechnical Investigation for the proposed 4-Laning of NH-37A from 0.00 km Kalibor Tiniali Road Junction to 17.3 km Dolabari Road Junction in Tezpur, Assam.
|
Larsen & Toubro Limited |
2014-2015 |
18
|
Geotechnical Investigation and report submission for Sone Bridge in the district of Aurangabad and Rohtas in the state of Bihar.
|
Hindustan Construction Co Ltd. |
2014-2015 |
19
|
Sub-Soil Exploration work for Sone Bridge Site at Dehri-on-Sone in Bihar.
|
|
2014-2015 |
20
|
Sub Soil Investigation work for Improvement / Up gradation of Varuna – Rasiyari Road (SH – 88) Length – 120.354 km
|
BSC – C & C – “JV” |
2014-2015 |
21
|
Sub-Soil Exploration and Slope Stability Analysis work for Bagmati Extension Scheme in Bihar.
|
Coolroc Technologies Limited (JV) |
2014-2015 |
22
|
Soil investigation in construction for the C/o H.L. Bridge at Aguwani Ghat Sultanganj over river Ganga Bhagalpur Dist.in Bihar.
|
M/S S.P.Singla Construction Pvt. Ltd.
|
2014-2015 |
23
|
Geotechnicat investigation work for plate load Test for ROB in lieu of LC-22SPL at Narakatiaganj yard.
|
IRCON INTERNATONAL LIMITED
|
2014-2015 |
24
|
Geo Technical investigation of sub soil at cutting, profile & slop stability analysis of new and existing cut slopes/embankments etc. for Railway formation from Udaipur – Sabroom section chainage from Km 44.00 to Km 114.134 in connection with new BG Railway line of Agartala – Sabroom project.
|
N. F. RAILWAY
|
2015-2017 |
25
|
Conducting Plate Load Test at proposed Road Over Bridges – lsmalpur-Rafiganj -Road over bridge in lieu of level crossing ,No.19/B,Pusauli-Muthani-Road over bridge in lieu of level crossing No.56/C,Guraru-lsmai!pur-Roacl over bridge in lieu of level crossing No.11/B, Karwandia : Sasaram -Road over bridge in lieu of !eve.I crossing No.39/C, Cliandauin anjawar -Road over bridge in lieu of level crossing No.76/A.
|
E.C.RAILWAY
|
2015-2016 |
26
|
Carrying out the soil investigation with bore logs, soil testing etc. for construction of ROBs in lieu of LC No. 112 in Kanti Yard. 12 I in Moti pur yar9, 124 between Motipir-Mahwal, 160 in Bapudhtm Motihari yard and 49 between Kharpokhra-Bugha in Samastipur Division.
|
E.C.RAILWAY
|
2015-2016 |
S.no
|
Projects
|
Clients
|
Years |
1
|
Carrying out the soil investigation with bore logs, soil testing etc. for construction of ROBs in lieu of LC.No. 112 in KT yard, 121 in MTR yard, 124 between MTR-Ml-IL, 160 in BMKI yard and 49 between KPB-BUG in SPJ Division.
|
|
2016 |
2
|
Conducting soil and strata test at foundation of Bridge Nos. 148, 150, 165, 166, 167, 168, 168A, 168B, 168C, 169.A, 169B, 169C. 169D. 171. 172. 173. 175 & 176 (18 Nos.) retaining wall and toe wall from km 76.00 to 98.00 in between Khongsang – Tupul in connection with construction of new Railway line project Jiribam-Imphal of N.F.Railway (Construction).
|
Northeast Frontier Railway |
2016-2017 |
3
|
Soil investigation, Finalisation of alignment, Preparation of GAD, Design and drawing of substructure and superstructure etc for construction of ROB in lieu of existing level crossing No 26 at Darbhanga.
|
EAST CENTRAL RAILWAY |
2016-2017 |
4
|
Geotechnical Investigation & Sub-soil Exploration for the project of “Preparation of Detailed Project Report and Feasibility Study of a 4-Lane Elevated/ Extra Dose Cable bridge on River Ganga parallel to & Western side of Digha-Sonepur RailcumRoad bridge” in Bihar.
|
Rodie Consultants Private Limited |
2020 |
5
|
Collecting site details and other dimensional details, designing of foundation and sub structure complete includingsuperstructure suitable for RDSO standard spans, submission of detailed design, drawaing & estimate for construction of ROBs in lieu of LC No.112 in Kanti yard, 121 in Motipur yard, 124 between Motipur-Mahwal, 160 in Bapudham Motihari yard & 49 between Kharpokhra Bugha in Samastipur Division
|
East Central Railway, Samastipur |
2016 |
6
|
Earth work in cutting, filling,blanketing,turfing, construction of major & minor bridge, limited Hight Sub-way,Foot over bridge, S & T buildings staff qurters TYPE-II(12 nos) & TYPE-III(2 nos),water supply arrangements, development of circulating area, approach road, supplying & fixing various Board,Land Boundary pillars,bridge inspection steps, and other associated works as per Railways’ specification and standards between Damodar River (ch-97.960Km) to patratu in connection with doubling between Ranchi Road 7 Patratu under Dhanbad Division of East Central Railway.
|
East Central Railway |
2016-17 |
7
|
Construction of Green Field Six Lane Extradosed Cable Bridge over River Ganga near Kacchi Dargah in Dist. Patna.
|
Daewoo – L&T JV
|
2016-17 |
8
|
Geo-Technical investigation and finalization of BOQ for the work of Earth Work in formation in Cutting/filling including compactions,blanketing, turfing, side drain & catch water drains, construction of minor bridges, construction of quarters &platforms, FOB’s other miscellaneous activities and associated works under Pkg 57B, 58A & 58B.
|
K. N. International Limited |
2016-17 |
9
|
Geotechnical Investigation Including Drilling of Boreholes, Testing of Samples Etc. In Connection With Proposed Doubling of Existing Railway Line Between Kiul – Gaya 124.304 Km Long Of East Central Railway.
|
Ircon International Ltd. |
2016-17 |
10
|
Geo-technical Services for the Rehabilitation and Upgrading of 2 Lane / 2 Lane with Paved Shoulders Configuration and Strengthening of Sitamarhi – Jainagar – Narahia Section (Package No. NHIIP-BR-104-11) Lot-III- km 156.500 to km 219.945 Under Phase-1 of National Highway Interconnectivity Improvement Project (NHIIP).
|
Nagesh Consultants |
2016-17 |
11
|
Geotechnical Investigation ,Preparation of General Arrangement Drawing , showing approaches , proper alingment, slip road, infringement to be shifted, land plan etc. in detail for 11 nos proposed Road Over Bridges between Mughalsarai and Manpur in G.C.Section of MGS division.
|
EAST CENTRAL RAILWAY |
2016 |
12
|
Geo Technical investigation of sub soil at cutting, profile & slop stability analysis of new and existing cut slopes/embankments etc. for Railway formation from Udaipur – Sabroom section chainage from Km 44.00 to Km 114.134 in connection with new BG Railway line of Agartala – Sabroom project.
|
N.F. Railway |
2016 |
13
|
Geotechnical investigation for prepr
ation of DPR for Indrap
uri Reservoir scheme including Backwater studies, assessment of afflux and ESIA study.
|
Sasaram, Bihar |
2017-2018 |
14
|
Sub soil investigation, preparation and submission of reports for the work for “Earth work in formation in cutting/filling including compactions, blanketing, turfing, side drain & catch water drains, construction of minor bridges, construction of quarters & platforms, FOB’s & other miscellaneous activities and associated works between Jogidih km 110.9 (Excluding Yard) to Obra Dam km 138.90 (including Yard) in connection with Doubling of Ramna – Singrauli (160 km) BG Rail line Project under Dhanbad Division in ECR.
|
Gannon Dunkerley & Co. Ltd., |
2017 – 2018 |
15
|
Rehabilitation and Up-gradation of Amravati-Nandgaon-Morshi-Warud-Pandhurna National Highway from existing km 52+440 (Morshi) to km 0+000 (Maharashtra/Madhya Pradesh State Border upto Wardha River Bridge) [Design km.43.000 to km. 95.390] to Two lane with paved shoulders in the state of Maharashtra on EPC Mode.
|
SHP Consulting Engineers |
2017 – 2018 |
16
|
Geo-Technical Investigation for various locations, From Ch: 13+500 to 21.50 Km for the Project of Construction of Ganga Path from Digha to Didarganj (21.5KM) at Patna” in the State of Bihar
|
NAVAYUGA ENGINEERING COMPANY LTD. |
2017 |
17
|
Geotechnical Investigation For Construction Of Minor Bridges Between Billi And Chopan In CIC Line Under Dhanbad Division of E. C. Railway Doubling (Construction). / ROB Near Br. No.-382
|
S.T.CONSTRUCTIONS PVT.LTD |
2017 |
18
|
Geotechnical Investigation Report for Proposed Multi – Storied Building The Great Ashoka City At Patna.
|
Aparna Architech & Engicons Pvt. Ltd. |
2017 |
19
|
Conducting the Benkel Beam Deflection Test and Sub Grade Soil test for designing the overlay for NH‐80, MOKAMA‐MUNGER Section. (Total Length of 63 Km).
|
Nagesh Consultants |
2017 – 2018 |
20
|
Plate Load Test and submission of reports at small bridge locationsed works between Jogidih Km 110.9 (Excluding Yard) to Obra Dam Km. 138.90 (including Yard) in Connection with Doubling of Ramna – Singrauli (160 Km.) BG Rail line Project under Dhanbad Division in ECR.
|
Gannon Dunkerley & Co. Ltd., |
2017-2018 |
21
|
Soil investigation work of major/minor bridges in connection with doubling work of Muzaffarpur – Sagauli section and Sagauli – Narkatiaganj section.
|
EAST CENTRAL RAILWAY |
2018-2020 |
22
|
Geotechinical Investigation works in between Chaparmukh (Ch.98.0 km) toHojai( Ch 145 Km) in connection with Digaru to Hojai Doubling Project of N.F. Railway.
|
N.F. Railway |
2018-2019 |
23
|
Final location/ pre-construction survey for new BG single Railway line alignment (98.56 km) including stacking of alignment on ground, geological and geo te chnical investigation, preparation of detailed estimate, drawing and ancillary worb in coonection with construction of new BG line between Salons (near Nowgaon) and Khumtai (Near Numaligarh).
|
N.F. Railway |
2018-2020 |
24
|
Carrying out soil investigation with bore logsfor construction of minor bridges and limited height sub-ways between Chittorgarh-Nimach section in connection with COR-NMH doubling project of Ratlam division of Western Railway.
|
WESTERN RAILWAY |
2018 |
25
|
Soil Investigation Work forConstruction of Green Field Six Lane Extradosed Cable Bridge over River Ganga near Kacchi Dargah in Dist. Patna.
|
Daewoo – L&T JV |
2016-2018 |
26
|
Complete Soil exploration at proposed ROBs in lieu of LC no. 1 & 2 between DBG-MHP, LC No. 10 between MHP-KML, LC No. 21 between LSI-DBG, LC No. 28 & 32 between DBG-SKI and LC No. 39 in SKI-yard and balance Minor Bridges in SK.1-NMA-JJPLKQ in connection with gauge conversion project of SKI-NMA-LKQ of Samastipur Division.
|
EAST CENTRAL RAILWAY |
2018 |
27
|
Geotechinical Investigation works in between Chaparmukh (Ch.98.0 km) to Hojai
( Ch 145 Km) in connection with Digaru to Hojai Doubling Project of N.F. Railway.
|
N.F. Railway |
2018-2019 |
28
|
Soil investigation, Preparation of GAD, Design and drawing of Sub structure & foundation with all structure component of different sizes as per Railway standard and superstructure if any and any other minor structure in connection with Road over bridge in lieu of Level crossing No.2/B/3T in Dhanbad-Kusunda Road , L.C. No-10/SPL/E in Bhandaridah – Phusro Road , L.C. No-13/SPL/T in Phusro -Arnio Route ,L.C. No- 14/SPL/E in Arnio -Bermo Route. L.C. No-26/SPL/T at km. 80/1-2 in Chandrapura Barkakana Route in CIC section & L.C.No.40A/T(km4S6-2S/27) near bhandhua yard in Howrah -Delhi GC route of Dhanbad Division under East Central Railway.
|
EAST CENTRAL RLY |
2018-2019 |
29
|
For Design of various bridges and related geotechnical investigations from stations New Bongaigaon km 251/4 to Agthori km 394/4 in connection with Doubling New Bongaigaon -Agthori station of N.F. Railway.
|
N.F. Railway |
2019 |
30
|
Conducting Subsoil Investigation Survey for Thiruvananthapuram -Kasaragod Semi High-Speed Rail Corridor.
|
KERALA RAIL DEVELOPMENT CORPORATION LTD |
2019 |
31
|
Providing Consultancy Services for Geo Technical Investigation for Ganaga Path Road Project.
|
GRIL |
2020 – 2021 |
32
|
Geotechnical Investigation & Sub-soil Exploration for the project of “Preparation of Detailed Project Report and Feasibility Study of a 4-Lane Elevated/ Extra Dose Cable bridge on River Ganga parallel to & Western side of Digha-Sonepur Railcum-Road bridge” in Bihar.
|
Rodic Consultants Private Limited |
2020 |
33
|
Geotechnical Investigation work for Four laning of Rajauli—Bakhtiyarpur section of NH-31 New NH-20 from Km 54.405 to Km101.630 (Package II) and from Km 101.630 to Km 152.520 Pkg-Ill on Hybrid annuity mode in the State of Bihar.
|
Aecom India Pvt Ltd |
2020 |
S.no | Projects | Clients | Years |
1 | Conducting geotechnical investigation for design for substructure in connection with construction of Road over bridge in lieu of LC no 69/C in between Karamnasa and Saidraja in GC section of DDU Division. | EAST CENTRAL RLY | 2021 |
2 | Geotechnical Investigation work in Bakarganj drain, Patna Smart city project, Bihar. | Patna Smart City Limited | 2021 |
3 | Rendering services for preparation of GAD of Major Bridges/LHS/RUB/ROB/ROR Building & other type of building, soil exploration , preparation of bill of quantity and documentation of bid process management for inviting EPC tenders for execution of project works in connection with for construction of doubling work in between Pradhankhunta – Parthdih section. | EAST CENTRAL RAILWAY | 2022 |
4 | Four Laning of NH 530B from Mathura Bypass (Start) (Existing km. 266.000 of SH 33-Design Km 0.000) to Gaju Village (End) (Design Km.32.982) (Design Length-32.982 km) in the State of Uttar Pradesh on HAM Mode (Pkg-1 B). | PNC lnfratech Limited | 2022 |
5 | Construction of 4-Lane Elevafod Road as a part of JP Ganga Path (Digha to Deedarganj from Nurrudin Ghat (Ch:16+975.79 Km) to Dharamshala Ghat (Ch:19+890 Km) (Length: 2.914 Km) with allied facilities and Widening and Strengthening of existing Road to 4-Lane from the junction of JP Ganga Path at Deedarganj(Ch:20+500Km) to ROB approach on SH-106(0ld NH-30) (Length-750 Mtr.) & Development of 4 lane road from Patna Sahib Railway station (Ch. 0+000) to Patna Ghat (Ch.1 +550) in replacement of existing old railway line of Patna Sahib-Patna Ghat at Patna in the State of Bihar on EPC Mode. | S.P. Singla Constructions Pvt. Ltd. | 2022 |
6 | Four Laning of NH 5308 from Gaju Village (Design km 32.982, Mathura – Aligarh District Boundary) to Devinagar Bypass (End) (Existing Km. 208.000 of SH 33 (NH-5308)/Design Km. 66.000) (Design length= 33.018 km) in the State of Uttar Pradesh on HAM mode (Pkg-1C). | PNC lnfratech Limited | 2022 |
7 | Proposal for Geotechnical Investigation work for Construction of Major Bridge/RFOs etc. in various locations from Sonnagar -Dankuni section under the Jurisdiction of GM/CoOrdination/Kolkata Unit | DFCCIL | 2022 |
8 | Geotechnical Investigation and Sub-soil Exploration and Material Investigation work for Preparation of Detailed Project Report of the work of 4/6 laning new bridge across river Ganga Connecting Matihani-Shamho Village in Begusarai District in the state of Bihar. | Rodic Consultants Private Limited | 2022 |
9 | Proposal for Geotechnical investigation work for construction of Railway staff quarters in various station of Dhanbad and Pt. Deen Dayal Upadhyay division in Sonnagar – Gomoh section under Jurisdiction GM / Co ordination/Kolkata unit. | DFCCIL | 2022 |
10 | Geo-Technical Investigation for Four Lanning of Parwanoo-Solan section of NH-22 (Now NH-5) from Km 67.000 to Km 106.139 in Himachal Pradesh on EPC Mode under NHDP Phase-III | Garware Technical Fibres Ltd. | 2022 |
11 | Geo-Technical Investigation for Four Lanning of Parwanoo-Solan section of NH-22 (Now NH-5) from Km 67.000 to Km 106.139 in Himachal Pradesh on EPC Mode under NHDP Phase-III | EAST CENTRAL RAILWAY | 2022 |
12 | Geotechnical Investigation and Sub-soil Exploration and Material Investigation work for Preparation of Detailed Project Report of the work of 4/6 laning new bridge across river Ganga Connecting Matihani-Shamho Village in Begusarai District in the state of Bihar. | Rodic Consultants Private Limited | 2022 |
13 | Preliminary work such as Soil Investigation & submission of its report, in connection with the work of “Setting up of Trainset Maintenance Depot at Shakurbasti ” Northern Rly. | Workshop Projects Organisation | 2022 |
14 | Geotechnical Investigation and Sub-soil Exploration and Material Investigation work for Preparation of Detailed Project Report of the work of Construction of 4/6 Lane Elevated corridor Anishabad (Patna)- Phulwari-AIIMS (7.00 Km) on Anishabad- Aurangabad- Hariharganj Road, New NH-139(01d NH-98) in the State of Bihar | Rodic Consultants Private Limited | 2023 |
15 | Final location/ pre-construction survey for new BG single Railway line alignment (98.56 km) including stacking of alignment on ground, geological and geo te chnical investigation, preparation of detailed estimate, drawing and ancillary worb in coonection with construction of new BG line between Salons (near Nowgaon) and Khumtai (Near Numaligarh). | N.F. Railway | 2018-2020 |
S.no | Projects | Clients | Years |
1 | Soil investigation, Preparation of GAD, Design and drawing of Sub structure & foundation with all structure component of different sizes as per Railway standard and superstructure if any and any other minor structure in connection with Road over bridge in lieu of Level crossing No.2/B/3T in Dhanbad-Kusunda Road , L.C. No-10/SPL/E in Bhandaridah – Phusro Road , L.C. No-13/SPL/T in Phusro -Arnio Route ,L.C. No- 14/SPL/E in Arnio -Bermo Route. L.C. No-26/SPL/T at km. 80/1-2 in Chandrapura Barkakana Route in CIC section & L.C.No.40A/T(km4S6-2S/27) near bhandhua yard in Howrah -Delhi GC route of Dhanbad Division under East Central Railway. | EAST CENTRAL RAILWAY | 2018 – Ongoing |
2 | Conducting Final Location Survey and Soil investigation work &DrawingofBridge/other structure for 1. Hazaribagh – Katkamasandi doubling (25 Km), DEMUCaptive Tubed Mines connectivity (13 Km), 3. Shipur – Chatti Bariatu/Kerandhari new line (15 Km), 4. Bes – Gondilpara new line project to connect Private Coal Mines (15 Km), 5. Chetar – Rajbar D & E new line project to connect Private Coal Mines (14 Km), 6. Bes – Rohne Block new line project to connect Private Coal Mines (15 Km), 7. Mahuamilan – GMR, Chattisgarh Energy Limited Ganeshpura new line project to connect Private Coal Mines (22 Km) of East Central Railway. | EASTERN RAILWAY | 2022 – Ongoing |
3 | Rendering services for preparation of GAD of Major Bridges/LHS/ RUB/ROB/ROR Building & other type of building, soil explorati on , preparation of bill of quantity and docum entation of bid process management for inviting EPC tenders for execution of project works in connection with for construction of doubling work in between Pradhankhunta – Parthdih section. | EAST CENTRAL RAILWAY | 2022 – Ongoing |
4 | Preparation of Design and Drawing of (i) Minor Bridges (ii) Major Bridge Sub & Super structure (iii) Building (iv) RUB (v) Platform (vi) Platform shed (vii) LCN Gate (viii) Surface Drain & Road etc. or as advise by EIC, Geotechnical investigationass per advice, for the work of Earth work in filling for construction of railway embankment from Ch.- 26000 to Ch.- 27370 m and Ch.- 28485 to Ch.- 42620 m (from Bishnupur) including Baragopinathpur (Ch.- 30780, Jayrambati (Ch.- 37820) and Kamarpukur station (Ch.- 43070), Maynapur (Ch.- 23200) to Goghat (Ch.- 48570) and other related work including laying in between Maynapur (including Yard) and Goghat (Including Yard ) over Bankura & Hooghly District in connection with the construction of New B.G. rail line fromTarakeswar to Bishnupur. | EASTERN RAILWAY | 2022 – Ongoing |
5 | Geotechnical investigation, Conducting various test of soil as per Railway guideline & preparing Geotechnical reports including design of 3 nos underpass/Major Bridges, design of Railway embankment, retaining wall of different height etc,from Km 163/00 to 165/400 to provide permanent mitigation measures in elephant corridors near Deepor beel area between stationsAZA & KYQ in connection with NBQ-GLPT-KYQ DL project. | NORTHEAST FRONTIER RAILWAY | 2023 – Ongoing |
6 | Final Location Survey (FLS) for New Line between Laheriyasarai – Saharsa stations (approx-100.0 KMs.) via Jamalpur and Mushariya, carrying out detail Engineering survey including leveling, alignment, soil exploration,preparation of plans, L-sections, GAD plans of Bridges etc.,bill of quantities, preparation of detailed project report and other related ancillary activities in connection with Final Location Survey for New Line between Laheriyasarai – Saharsa stations. | EAST CENTRAL RAILWAY | 2023 – Ongoing |
7 | Soil exploration and other Misc work for preparation of EPC tenders in connection with doubling work in between Dhanbad Chandrapura via Tetulmari,Nichitpur,Matari, Telo including Yconnectionin Dhanbad & Chandrapura (42.72 Km) under Dy.CE/Con/BRKA. | EAST CENTRAL RAILWAY | 2023 – Ongoing |
8 | Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from Pachmon village to Anarbansalea village (From Km.116+000 to Km.151+200, Package-61 Total Length=35.20 Km) under Bharatmala Pariyojana in the state of Bihar on Hybrid Annuity Mode (Package-6). | PNC lnfratech Limited | 2023 – Ongoing |
9 | Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from Anarbansalea village to Sagrampur village (From KM. 151+200 to KM. 184+700, Pkg-7, Total Length = 33.5Km) under Bharatmala Pariyojana in the state of Bihar on Hybrid Annuity Mode” henceforth called as ‘ANSA’. | GRIL | 2023 – Ongoing |
10 | Geo Technical Investigation for design of Major bridge, Minor bridges, ROB & RUB/LHS and along the formation and Design and Drawings of 01 nos. Major bridge (8* 18.3m+2*12.2m), 14 nos. Minor bridges, 4 nos. RUB/LHS & other related structures along with adequacy/Suitability of Existing Minor Bridges in connection with Doubling of Chandrapura – Jamuniatand section under jurisdiction of Dy CE/Construction/Dhanbad in Dhanbad Division of East Central Railway. | EAST CENTRAL RAILWAY | 2024 – Ongoing |
11 | Geo-technical investigation, design and preparation of GAD etc. for proposed construction of ROBs in lieu of LC No-124, 133, 150, 157, 161, 167A & ST-100 over BHC-PSA under KUR Division of East Coast Railway | EAST COST RAILWAY | 2024 – Ongoing |
12 | Execution of various preliminaryactivities like Geo-Technical investigation, topographical Survey, preparation of GAD plans & design of structuresetc. in connection with proposed construction of 17 NosRoad Over Bridge(ROB) along with provision of Staircase and LHS/Light FOB in lieu of closing of manned LCNo of LC No-264, 265, 268, 269, 278, 279, 280, 281,282,283, 284, 294, 302, 315, 319, 322 & 325 over KUR-PSAmain line of Khurda Road Division of East Coast Railway. | EAST COAST RAILWAY | 2024 – Ongoing |
13 | Execution of various preliminary activities like Geo-Technical investigation, topographical Survey, preparation of GAD plans & design of structures etc. in connection with proposed construction of 18 Nos Road Over Bridge(ROB) along with provision of Stair case and LHS/Light FOB in lieu of closing of manned LC No of LC No-JB-07, 205,CP-48,211, 224, 229, 230, 231, 234, 238, 239, 241, 243, 246, 250, 251, 253 & 258 over Khurda Road Division of East Coast Railway. | EAST COAST RAILWAY | 2024 – Ongoing |
14 | Site Survey, Geotechnical investigations, development and approval of General Arrangement Drawings(GADs) and Land Plans, development and approval of structural design and drawings in connection with construction of ROBs in Bhopal Division and Jabalpur Division by Construction Organization. | WEST CENTRAL RAILWAY | 2024 – Ongoing |